Contractors/Construction

Gin PoleCDMI’s Lite Site simplifies the construction process. The entire foundation and monopole can be installed in one day. The Lite-Site’s standardized design takes the guess work out of assembly and installation. With the on grade foundation, no ground penetration is required. This eliminates the need for costly and time consuming site preparation and foundation work.

With loading of less than 1,500 psf no geotechnical investigation is required. Ground preparation can be as simple as a level blacktop parking lot or as complicated as removing organic material and compacting a level gravel base. The base frame trays are then bolted together with basic hand tools. The “anchor bolts” are bolted to the base tray. Ballast is added to the base frame. Grounding and monopole installation are no different than a traditional site. CDMI has created standardized monopoles for use with the Lite-Site base frames. CDMI provides security fencing that attaches to the base frame.